Flooring removal complete...
my new flooring will not ready to install until about the 1st week in Aug...
I have a few new holes in my hands from breaking the tack strips into smaller pieces to fit into my trash box I had for them...
what else should I do today?...besides workout of course....

my new flooring will not ready to install until about the 1st week in Aug...

I have a few new holes in my hands from breaking the tack strips into smaller pieces to fit into my trash box I had for them...

what else should I do today?...besides workout of course....
