This weekend I became Bob Vila. Spent two days downstairs closing the outside of the walls for the studio. Time to find some insulation and a roof for stage 2. Stage 3 will be sheet-rock tape, mud, and the yet undecided wall treatment. We've got loads of spare carpet, so i'm thinking we're gonna make the room sound as dead as possible.
BBQ'd for Punt's birthday, had some drinks with some old friends.
More construction this week, the band comes up this weekend, and then we're playing a show at the Scene in Glendale. If you're around, come by and say hi
In the meantime, i'll be here:

BBQ'd for Punt's birthday, had some drinks with some old friends.
More construction this week, the band comes up this weekend, and then we're playing a show at the Scene in Glendale. If you're around, come by and say hi
In the meantime, i'll be here:

VIEW 4 of 4 COMMENTS
liquidflorian:
you guys might want to foam pad those Beams in the basement. Save some noggins.....
johnny_fantastic:
you guys gonna finish before you gotta move away?