Half of the place is painted, the new aquarium is bring picked up tonight and I just finished preparing the old tank for the move. I managed to get enough lighting up to make my way around, my bed in and even the closet sorted out.
I am tired.
What remains is building a loft, installing a sliding glass door where there is currently a wall and constructing the stand for the new tank. 2000+ lbs of sand, rock and water make for some fairly heafty construction . . .
Oh, and then I have to run enough new circuits to power the monster . . .
I have to go pick up visitors from the airport now.
I am tired.
What remains is building a loft, installing a sliding glass door where there is currently a wall and constructing the stand for the new tank. 2000+ lbs of sand, rock and water make for some fairly heafty construction . . .
Oh, and then I have to run enough new circuits to power the monster . . .
I have to go pick up visitors from the airport now.


VIEW 4 of 4 COMMENTS
V_S